A 200 megawatt battery rising on 15 acres outside Columbus will hold over 1 gigawatt hour of power, and it is becoming the largest ever built inside the 13 state PJM grid
A gravel lot outside Columbus has gone from empty field to steel skeleton in a matter of months.Crews are bolting together rows…